Project reference

Laboratory BMS for TII

Intellicon provided the building management system for a laboratory at TII, a research institute. This page records the project and explains what a laboratory BMS scope typically includes, so a consultant or facility team can compare it with their own brief.

Ask About a Similar ScopeAll Projects →
Project record

What We Can Confirm

Client
TII
Sector
Research institute
Scope
Building management system for a laboratory
Supplier
Intellicon International Trading LLC

We publish only what the client relationship allows. Scope documents, reference contacts and a site visit can be arranged on request, with the client's permission.

For comparison

What a laboratory BMS scope typically includes

This is a general description of the scope type, to help a consultant or facility team compare it with their own brief. It is not a list of the equipment installed on the site above.

Ventilation and room pressure

Laboratories depend on airflow direction. A BMS typically monitors supply and exhaust airflow, room differential pressure and fume-cupboard exhaust status, and raises an alarm when a space loses its intended pressure relationship.

Environmental monitoring and records

Temperature and humidity are trended against limits, with time-stamped alarms and historical logs that a quality or facilities team can export.

Plant integration

Air handling units, chilled-water plant, pumps and variable-speed drives are connected over BACnet or Modbus, with graphics and sequences agreed with the consultant.

Alarm priorities

Critical, high and advisory alarms are kept separate so that a failed exhaust fan is not buried among comfort alerts.

Commissioning and handover

Point-to-point verification, functional tests of the sequences, operator training and as-built documentation.

References

Design References Typically Used

  • ASHRAE 62.1 for ventilation rates
  • ANSI/ASSP Z9.5 for laboratory ventilation
  • The project specification and the requirements of the authority having jurisdiction

Which standards apply, and the approvals required, depend on the project and the authority having jurisdiction.

Planning a Similar Scope?

Tell us the building type and the systems on site. We will confirm what is reachable and what a survey needs to establish.

Request a Site Survey+971 56 508 8525