Solution

Building Management System (BMS)

DDC panels, BACnet/Modbus integration, ISMA controllers, Weintek HMI panels built in EasyBuilder Pro, alarms, trends, and full commissioning. Proven across 150+ UAE projects.

Request BMS SurveyAll Services β†’
49%
Cooling Share of Dubai Electricity Demand, 2024 (RSB Dubai)
Live
Fault Detection & Alarms
BACnet/IP
Primary Protocol
Per site
Payback Modelled by Survey

Cooling share: RSB Dubai Annual Report 2024, p. 33 (26,338 GWh, 49% of demand on DEWA's grid).

Core Capabilities

Comprehensive System Features

🌑️

HVAC Monitoring & Control

Real-time AHU, FCU, chiller, and VAV control with feedback loops, setpoint management, and alarm handling.

⚑

Energy Meter Integration

kWh, kW, PF, and KVAH metering integrated via Modbus/BACnet into live dashboards and monthly reports.

πŸ””

Alarm Management

Priority-based alarm routing β€” email, SMS, and BMS console β€” with acknowledgement tracking and event history.

πŸ“ˆ

Trend Logging & Analytics

Long-term trend data for all points. Exportable for energy audits, DEWA benchmarking, and Al Sa'fat submissions.

πŸ–₯️

Centralized Dashboards

Weintek HMI panels (EasyBuilder Pro) and custom graphics showing building-wide system status, live values, and interactive controls.

πŸ”—

Equipment Integration

Fire alarm, CCTV, access control, lift systems β€” all integrated into a single BMS interface via open protocols.

Architecture

Built on Open, Scalable Architecture

BACnet/IP & Modbus Integration
Any brand of field device β€” ISMA, Siemens, Honeywell, Schneider, Belimo β€” integrated via BACnet/IP, BACnet MS/TP, or Modbus RTU/TCP.
Open Protocol Controllers
ISMA DDC controllers with JSON-based programming ensure no proprietary lock-in. You own your system.
Tridium Niagara Supervisory Layer
We build and commission on the Niagara Framework with JACE controllers where a site needs one vendor-neutral head-end over mixed plant β€” BACnet, Modbus and proprietary drivers normalised into a single point database, graphics set and alarm hierarchy.
Weintek HMI Panels
Local operator interfaces built in EasyBuilder Pro for plant rooms and substations, so an engineer on site can see and act without going back to the head-end.
Deployment Flexibility
Standalone building, campus-wide, or cloud-connected via VPN/secure tunnel β€” we architect to your security requirements.
Scalable From Day One
Start with core HVAC monitoring. Add metering, leak detection, and IAQ layers as budget allows β€” no system replacement required.
Applications

Proven Across Diverse Facilities

🏒
Commercial Buildings
Office towers, retail centres & mixed-use developments.
πŸ₯
Healthcare Facilities
Hospitals and clinics. Precision environmental control and regulatory compliance.
πŸŽ“
Educational Institutions
Schools and universities. Multi-building management from a single console.
🏨
Hospitality Properties
Hotels. Guest-by-room HVAC scheduling and energy optimisation.
🏭
Industrial Facilities
Manufacturing plants. Precise environmental conditions for processes.
Case Study

BMS Deployment β€” Dubai Hills

Intellicon has delivered BMS integration for residential and mixed-use developments in Dubai Hills, covering DDC panel installation, BACnet/Modbus integration for HVAC plant rooms, centralized EB Pro dashboards, and full alarm/trend logging commissioning β€” bringing the same open-protocol architecture we deploy across 150+ UAE projects to the Dubai Hills community.

Request a Free BMS Survey
Compliance & Standards
ASHRAE 62.1
ASHRAE 90.1
Al Sa'fat Green Building
DEWA Efficiency Standards
Dubai Municipality
ICV UAE v3.0
BACnet Standard (ANSI/ASHRAE 135)
NFPA 72 (Fire Alarm Integration)

Frequently Asked Questions

What is a Building Management System (BMS)?

A Building Management System (BMS) is a control system installed in buildings to monitor and manage mechanical and electrical equipment such as HVAC, lighting, power, fire, and security systems. Intellicon integrates BMS solutions for commercial, industrial, and government buildings across the GCC and Africa.

How much does a BMS cost in the UAE?

BMS project costs typically range from AED 80,000 to AED 600,000 for standard commercial towers. Factors include the number of integration points, DDC panel complexity, and software requirements. We offer free site surveys to provide precise quotations.

Can a BMS reduce energy consumption?

Yes, it can. A BMS reduces energy use by automating HVAC scheduling, implementing Demand Controlled Ventilation (DCV) and providing real-time fault detection. Dubai’s electricity regulator, RSB Dubai, says cooling represents almost half of the emirate’s total electricity demand, so that is where control matters most. The size of the saving depends on the building, and we confirm it by site survey rather than quote a fixed figure.

Does Intellicon work on government and UN projects?

Yes. Intellicon has experience in institutional and development sector projects including NGO and government-funded smart infrastructure in Africa and the GCC.

What countries does Intellicon operate in?

We serve clients across the GCC (UAE, Saudi Arabia, Oman, Qatar, Kuwait) and Africa (Nigeria, Kenya, Egypt, and other markets). We also support international development projects and institutional tenders globally.

What is energy metering and why do facilities need it?

Energy metering tracks real-time electricity, water, and gas consumption across a facility. It helps facilities identify waste, reduce utility bills, and meet sustainability reporting requirements.

Ready to Optimise Your Facility?

Our engineers will assess your building and design the right BMS solution.

Request a Free BMS Survey